We carried out a screening study for a relatively large onshore non-associated gas field in Indonesia. A key element of the study was to assess the optimum method for production of this field which had a significant hydrogen sulphide content – 1mol%. The optimisation was based on plant designed to treat 200 million standard cubic feet of raw gas. The development and operating cost estimates were generated using our NETCOSTER Cost Evaluation Software.