Project Details

Reserves Verification and Valuation ? Onshore Field

Performed a reserves verification and carried out a valuation for this onshore field in Nigeria. Carried out the verification to the standards set by the PRMS. The valuation was carried out following a field development planning assessment designed to establish the optimal production facility and drilling campaign required to fully develop the property. Development and operating cost estimates were generated using our NETCO$TER cost Evaluation Software.  





Contact Us



Name*:
Company*:
Telephone*:
E-Mail*:
Please outline
your interests:
* = required field
© 2017 All rights reserved, Bayphase Ltd | Intranet | Site Map