Project Details

Independent Reserves Assessment and Field Development Plan - Onshore Field

Developed independent deterministic and probabilistic reserves assessments for this giant field in Kazakhstan accordance with the PRMS standard. This field is a super giant carbonate structure that is significantly overpressured

Developed a fully integrated geological and reservoir simulation model for the field. The work included full assessment and interpretation of a 2D seismic data set, development of a static geological model and a dynamic reservoir model. Carried our modelling to determine optimum configuration for a gas re-injection scheme. Also carried out conceptual field development planning to determine the associated surface production scheme.

Special features considered included: fracture modelling and prediction to determine potential contribution to reserves; analysis of Soviet era well tests, well logs and seismic data

Prepared reserves certification statements in accordance the PRMS standard and in accordance with regulations set down by Kazakhstan’s State Reserves Committee. 





Contact Us



Name*:
Company*:
Telephone*:
E-Mail*:
Please outline
your interests:
* = required field
© 2017 All rights reserved, Bayphase Ltd | Intranet | Site Map